Skip to main content

Spindle reset form

Here you can reset the operating hours counter after replacing a spindle..


Spindle replacement checklist

  • Switch off the energy supply (electricity) completely.
  • Make sure that the spindle shaft is absolutely stationary.
  • Remove all connections from the spindle.
  • Remove the spindle from the machine according to the instructions.
  
Spindel Formular V1

Checklist after spindle replacement

  • After mounting the spindle, the spindle must run in for 20 minutes. With the automatic run-in procedure, the process is carried out when the operating hours counter is reset.
  • Check the direction of rotation of the spindle with M03 (clockwise rotation).
  • Check the machine zero point "G58" with the dongle belonging to the machine. Clamp the dongle in the spindle's collet and approach the machine zero point X = "0" and Y = "0". Deviations must be corrected in the register machine parameters.
  • Clamp a milling cutter in the collet and check the tool positions. Correct deviations in the register machine parameters.
  • For machines with a camera, calibration and correction of the offset "Spindle > Camera" are required.

Send the removed spindle to SCHUNK Electroinic Solutions GmbH for maintenance or repair

our service

Our advice

Depaneling made in Germany

Inline Depaneling - ILR
Standalone Depaneling - SAR